The TEG3 set is crossing the Manatee River into Bradenton & will go all the way to the end of their line at Oneco where SGLR starts.
Geometry train is inspecting the entire length of mainline between Tampa and Oneco.
TGC3 is coming out of Yeoman Yard heading south to the end of their territory at Oneco, on the other side of Bradenton where SGLR takes over.
Lot of testing around the area in 2021 continuing into 2022.
For the third time in less than 12 months, CSXT has sent a geometry train to inspect the tracks in and around Tampa Bay. This, combined with the extensive inspection with the OCS in the same time... (more)
For the third time in less than 12 months, CSXT has sent a geometry train to inspect the tracks in and around Tampa Bay. Today, TGC3 is heading all the way thru to the end of their territory in O... (more)