Easing along operating long hood forward, A007-12 unloads new crossties beside the mainline for later installment.
Loads of ballast scurry north behind both an EMD Dash 3 and a Dash 2 locomotive, as A007 rolls through Pyne, GA with the lead engine blowing out smoke while it picks up speed.