CP 118 departs Coldwell behind a pair of ES44AC's running alongside Echo Lake, and a mile ahead Lake Superior and the Mink Tunnel.
The daily Edmonton IMS, AB - Montreal Hochelaga, PQ stacker pulls through Heron Bay with 129 platforms. CP ES44AC 8914 is shoving up the rear.
An ice fisherman takes in the last of the season jumping on his skidoo heading for Cash Lake, checking out the train passing by.
In 2015 CP built a new 14,000ft siding east of the exisiting 6700ft siding in Marathon. In early 2017 crews removed the old west switch of the siding and its now a 6700ft stub track.
CP train 118 heads through Marathon with 61 platforms