After a pickup and a setoff at Swan Landing, the Edson Sub roadswitcher is back on the move destined for Jasper.
The Edson-Jasper roadswitcher limps towards Jasper at about 7mph due to excess tonnage and poor power. Nevertheless, it looked great and sounded awesome!