Looking good wearing the swoosh paint scheme, a pair of remote control units are busy moving around cars in the Pueblo yard this morning. A very brand new GE ES44C4, which is indicative of that st... (more)
The Pueblo yard job Y-PUE302 has almost finished its work this morning with just a few more car loads to move. Meanwhile the locomotives for today’s Pueblo to Laurel, MT freight train sit quiet... (more)
The engineer of 302 watches his train shove back into 6 as he stands in the now wide open space offered by the removal of the yard’s caboose tracks. Just a year ago, this spot was occupied by t... (more)
On a sunny morning in Pueblo, the 302 yard crew positions today’s 101 power which includes a Canadian Pacific visitor as part of the motive power.
After setting the power for 101 off in track 1, 302’s locomotives head into track 4 to retrieve cars needing some sorting. A noticeable change has occurred in the yard since the last time I was... (more)