Conductors view out of the first UP rock train of the 2007 season. The train is crossing the Lake Wisconsin on the Merrimac Bridge.
First ballast train of the 2007 rock season waits on the main @ rock springs for mow to clear up. A loaded WSOR grain train waits in the siding to be picked up later that night by the MALPM and ta... (more)
UP 3097, a "Snoot" and one of only four that can lead in the C&NW territory, leads a westbound stacker through Wheaton.