UP 6074 splits the signals at SP865.2. Unfortunately, these signals are no more, with the extension of the Bosque siding. These signals are being replaced and removed.
A Herzog work train is delivered to Ventura Ca. to help with the clean up of the many mud flows as a result of heavy rains on the Santa Barbara Sub.
UP 8959 leading a manifest down Donner Pass. This train has just crossing into Nevada from California and will now begin it's trek into the deserts of Nevada and Utah.