An eastbound UP coal load fills the entire length of the KCT's High Line Bridge as it moves through the junction onto the Transcon.
Union Pacific's Denver-Salt Lake manifest curves west through the Kyune Gooseneck on the afternoon of July 3rd. The 125 car and 8400 foot train is equipped with a three unit manned helper, maintai... (more)
UP 6456 waits on the mainline as 2 broken rails are getting fixed at Goreville. He will wait 3 hours before heading South.
UP 6456 and SP 349 making their own tracks today!
After backing into the J Yd. early this morning, they finally pull down through West Chicago at 1800.