After working uphill through San Timoteo Canyon, UP 3926 is about the reach the summit on Banning Pass with a long doublestack in tow.
The early morning sun greets Union Pacific 3926 as it grinds up San Timoteo Canyon near the El Casco Lakes.
UP 3926 leads a long doublestack uphill out of Redlands and into the steep climb through San Timoteo Canyon.
AMPEPR passes through Emma Wood State Beach in the late afternoon with Mexico-bound empty autoracks.
Union Pacific 3926 leads an eastbound doublestack as it nears the summit in Banning Pass.
Ferromex-bound autos conclude their trip along the Pacific Ocean at Emma Wood State Beach. A relatively wet winter has allowed for some nice greenery.
North bound UP rail train at the crossovers at Moredock Lake on the UP Chester Sub.
Coal curves along the dry Mohave River bed.
Engineer's work station New SD70M delivered April 2003
Rear Of Cab-New SD70M Diagnostic Module Etc.
Inside UP 3926 Built March 2003