Passengers have left the CN station waiting room and await the opening of the gate to begin loading on The Canadian as blizzard conditions blow through Vancouver shutting down the airport and maki... (more)
VIA's Canadian is ready to load passengers at Vancouver, BC during a blizzard that will shut down the airport and close Hwy 1 in the Fraser Canyon. The train will run, leaving Vancouver on time. T... (more)