Lean Into It After building their train in Ayer, 23K gets moving at Shirley with a duo of ACes.
195 passes through the flood gates at Matewan, behind a snow-caked SD70ACe, in a March snowstorm.
NS SD70ACe 1147 does some switching in Springfield with a manifest.
NS 1147 & 8130 lead an eastbound on BNSF's Sandhills sub with a train load of Powder River Basin coal destined for Georgia.