Climax No. 3 pauses in the woods to siphon water.
Climax No. 3 rolls through the field at Nottingham, between Cass and Hevener Station.
Climax No. 3 performs a photo runby for photographers during Cass Railfan Weekend 2015
Climax No. 3 brings her train to a stop near Durbin for water. There's not water tank on the line; water is drawn from the creek, the same as was done during the logging days.
Two local children watch as Moore-Keppel & Co. #3 pulls a short mixed freight south of town.