Electric MU from Ronkonkoma to Penn Station passing the work zone. Next stop Brentwood Station.
“WORKER PROTECTION” Track workers awaiting the train from Ronkonkoma to Penn Station to pass. MP15AC’s 171 & 150 are the power for the concrete tie installation work train.
Protect Engine. The LIRR stationed a water tanker at Speonk yard for the Summer fire season. The Pine Barrens on the South Fork of Long Island can be prone to brush fires.
LIRR Work Extra 1 heading west through Little Neck with loaded gondolas from Port Washington's track work project.