Basically the only customer at the end of the line at Oelwein is Transco Repair Facility. Here the Oelwein crew comes around the wye to put their inbound cars away and pickup their outbound cars f... (more)
As Iowa prepares for the 1st major winter storm of the season, the IANR's South Crew is about done for the day at Bryant Yard. Conductor Shane Dolan works thru the heavy snow as he is about to jum... (more)
Work is done for the day for the Oelwein Job. They brought cars out of Oelwein, Fairbank, and Dunkerton today for the CN and UP. Now the power will layover here at the new siding named Bulter. The... (more)
The Oelwein Job heads back south to Waterloo with a good size train. Today's train is made up of 28 cars for the CN out of Fairbank and Dunkerton and 41 cars for the UP at Manly out of Oelwein and... (more)