Two Dash 9 with a former MRS unit, leads an iron ore train passing near by the city of Bacabeira in your way to Ponta da Madeira Terminal.
Empty grain train waiting for a meeting with a loaded iron ore train. The train was very light (around 2240 tons) for 10400 HP's so, only the Dash 9 was pulling, the SD40-2's were trailing.
Empty grain train leaded by a Dash 9 and two SD40-2 waits for a meet with a loaded iron ore train to proceed to the North South Railroad for another load of grain at central area of Brazil.
A Dash 9 and a nice SD70M leads an empty ore train waiting patiently the clearance of the line at Siding#03. The engineer was relaxing inside the air conditioned cab.