During the Aspen season, the Helper set makes its way through Pando, on its way back from Tennessee Pass to Minturn. The set includes two of the six CN GP40-2L locomotives, which were on test on t... (more)
A Westbound Rio Grande manifest is making quick work of climbing to Soldier Summit, Utah. Here it curves under the highway overpass at Colton.
A westbound Rio Grande mixed freight works its way upgrade toward Soldier Summit neat Royal.
Serviced and ready to serve, a Rio Grande GP40-2 awaits a call east out of Roper Yard. D&RGW 3098 was built by EMD for the Grande in April 1972.
A westbound Rio Grande piggyback train exits the Glenwood Tunnel in Glenwood Canyon, Colorado, on July 19, 1990. Three GP40-2 and two GP35s power the hot train.