CN ES44AC 3853 slowly leads train L597 south on the Grande Cache Sub heading for the Knelsen gravel pit south of Dorscheid.
ES44ACs 3853 and 2818 lead as westbound intermodal towards Tofield.
ES44ACs 3853 and 2818 approach Shonts as they head west on the Wainwright Sub.
CN 3853 Leads Q119 to Roberts Bank after getting signal indication down the BCR Port Sub
Approaching S. Fairlane back through N. Fairlane and with the tail end still crossing over the St. Louis River, CN 3853 leads about 20,000 tons of taconite pellets along the CN Missabe Sub.
CN 3853 about to duck under the Highway 37 overpass leading a heavy all-rail taconite train southward.
Another All-Rail taconite train loaded at U.S. Steel's Minntac plant make its way down the CN Missabe sub for points much further south than here in northern Minnesota.
CN M355 Noses Out Of The Former BCR North Vancouver Yard.
CN ES44AC 3853 leads Q147's 62 platforms and 28 autoracks west on the Oakville Sub at Aldershot.
A brief break in the clouds lets a pocket of sun shine on CN L503 as it departs the Belt Railway of Chicago's Clearing Yard and heads south down the CSX Eldson Sub.
Brand new CN ES44AC 3853 leads train Q150's 191 baretables from Thornton Yard in Vancouver to Prince Rupert across Highway #5 just east (north) of Valemount.