Parked temporarily at CN's Keenan Yard, this all-rail will eventually load taconite pellets at the U.S. Steel Minntac plant before heading south.
Toronto MacMillan, ON - Winnipeg Symington, MB #303 takes the curve around the top end of Long Lake passing through the town of Longlac.
CN ET44AC 3084 leads Prince Rupert-Chicago train Q192 across the Fraser River at Redpass, BC.