Columbia Basin, CBRW 302 & 651 lead the Wheeler Turn out of the Warden, WA yard on June 18, 2024. The Wheeler turn had 23 cars to switch at Wheeler.
CBR unit 302, a GP9, sits quietly in the yard as 1626 and 2294 depart for Moses Lake. Photo taken with permission.
Vintage EMD power lines up at Warden on the Columbia Basin Railroad.Photo taken with permission.
Arriving Sunnyside, I have no idea what mountain that is with the snow cap on it!
Air test complete, the CBRW departs Granger.
With twice as many cars as they arrived with, the Columbia Basin's train does an air test in Granger.