With temperature and snow both falling, an eastbound intermodal train led by BNSF 6997 climbs into the town of Cut Bank, Mt continuing it's trip across the Hi-Line
Its only just past sunrise, and already its close to eighty degrees in the Mojave Desert, but the heat won't stop hotshot traffic on BNSF's Southern Transcon Route. A Z train is seen splitting thr... (more)
Slowly grind up the grade of Ash Hill, four GE locomotives roar with life as they pull a heavy Chicago, IL to San Bernardino, CA intermodal around the 90 degree curve of Siberia where the two main... (more)
As the sun sets, BNSF 6997 is in charge of this K138 as it slowly heads east through Guilderland, NY.
A westbound 2x2 harbor bound stack train heads down Cajon Pass between Davis Ranch and Pine Lodge.
Bringing up the rear of this westbound stacker, BNSF 6997 passes through the Colton crossovers as it continues it's journey west. UP's Mt. Vernon connector can be seen to the left.
BNSF 6997 an Alstom rebuilt ex-CN SD40, SD40-2 7010 and GP40M 3015 wait to enter Vancouver Yard with an empty garbage train.
NS 13J eastbound past the westbound PRR signals at CP East Alton (CP144)