BEM 001 180-9 on the way from Wassertrüdingen to Nördlingen. This is the last testrun for this day. the testruns were necessary after some reconstruction Work at the locomotive.
001 180 -9 is passing the bridge over river Wörnitz on the way from Wassertrüdingen to Nordlingen at a test run after some reconstruction work. Fortunately BEM used this test runs for a foto ev... (more)
001 180 -9 has reached the final Destination Nördlingen after several test runs after some reconstruction work. Fortunately BEM used this test run for a foto event, very welcome, because all form... (more)
001 180 -9 has reached the Destination Donauwörth and is now on the way to the turntable to be turned for the way back to Nördlingen. In the Background a commuter Train rests at this public holi... (more)
001 180 -9 heads north " towards the Village "Möttingen". The Train is on the way from Donauwörth back to Nördlingen and has just passed the home Signal of the Station "Möt... (more)
001 180 -9 heads north in the wide valley of river "Wörnitz" towards the Village "Wörnitzstein".The Train is on the way from Donauwörth back to Nördlingen. In the foregroun... (more)
Steam train of BEM from Nödlingen to Neuenmarkt-Wirsberg passes the town Hohenstadt. the two coaches after locomotive are 2nd class coaches, the third is a comined 2nd class and dining car. the n... (more)