U24s 702/701 pass Al Disi with the second emptys working of the day to Hedjaz mine,as a norm there are 5 working train pairs a day working both ways .
U24s 702/701 head out of Aqaba Port after unloading Phosphate,the ship in the distance can be seen being loaded with phosphate .
A pair of Aqaba Railway Corporations U24s 702 and 701 head up the steady climb from Rum station passing Ash Shakiriyya with empty phosphate wagons for the mine at Hedjaz .