Since the timetable change in December 2024 and the introduction of the so-called short turnaround for Interregio trains in St. Moritz, the stopover time in Samedan is too short to attach the mail... (more)
Construction work on two tunnels on the Albula line has closed the line between Thusis and Preda for two weeks, with buses replacing the trains. Freight trains are being diverted via the Vereina l... (more)