Out of the shadows and into the sun. This Tazewell & Peoria potash train has just entered Union Pacific rails and is about 2 miles from its destination, the Mosiac facility on the Illinois River.
Tazewell & Peoria power leads an IAIS delivered potash train through the downtown Peoria riverfront area. This train is bound for the Mosiac facility on the Illinois River.
RLK 4003 brings a cut of grain empties into Hamilton yard after switching Bunge Inc. on the waterfront. The new James Street North GO Station is under construction at right.