For a short time during takeover, the IANR switcher job at Waterloo (WSE) started in the CN yard and made Bryant Yard flips. During that time the CN kept the power on the ramp track so they can co... (more)
The last 3 days the Iowa Northern side worked to get a train off the Oelwein Sub back to Waterloo. In doing that, they sent 2 sets of power to Fairbank to pull half of a unit train and a bunch of ... (more)
The Butler to Waterloo crew is beginning to assemble their train at Butler. The crew works in the afternoons and makes a Waterloo flip. This traffic is mainly bound for the either the CN, WACR job... (more)
The Butler to Waterloo flipper crew is about 3 miles from the junction with the CN. There they will travel over the CN Waterloo Sub to West Waterloo and onto Bryant Yard. Today's train has 62 cars... (more)
The Butler to Waterloo flipper job works south on the Manly Sub outside of Shell Rock. The 62-car train normally goes to work in the afternoon to move traffic off the north end of the railroad to ... (more)