Empty ore train headed by 1184 (Dash9W) and 1006 (Dash8) passing through the RH14.
A good place to take some pictures of the P001, you can catch the whole train after this leave Pedro Nolasco rail station at 07:00 AM.
Side view of meter gauge Dash9W that was leading a loaded coal train.
Destination Central Station Belo Horizonte a total duration of 13 hours travel.
Locomotives GE BB40-9WM 1302 and 1193 EFVM with a Ore Train at Tabual, Colatina-ES.
Locomotives GE BB40-9WM 1220, 1283 and 1119 EFVM with a Grain Train at Maria Ortiz, Colatina-ES.
1146 at mechanical maintenance line, waiting for overhaul.
RH12 tunnel from the town of Fundão at km 56 EFVM.
Dash-9 1183 leading empty ore train in Nova Era - MG.