With its station stop and meet of an eastbound container complete, an ontime Canadian heads West onto the Caramat Sub. The next station stop is 143 miles away, at Armstrong.
A five hour late Canadian makes its way through Bathurst with 24 cars in tow. The equipment move will terminate at TMC in Mimico and will be ready for a 2330 departure the same evening.