Train 9216 Hicksville-Babylon Shuttle approaches Babylon Station on Track 1. DM30AC 521 then 8 bilevels and DM30AC 522. LIRR Main Line shut down for third track work.
Weekend closures of the LIRR's mainline have become a regular occurrence as the railroad continues its third track expansion project. During these shutdowns, shuttle service between Hicksville an... (more)
Train 9214 the Hicksville-Babylon Shuttle is to the left at Bethpage Station. Train 9215 Babylon-Hicksville shuttle is to the right at the station. No LIRR Service on the Main Line west of Hicksvi... (more)
Hicksville-Babylon Shuttle train 9216 switching from Track 2 to Track 1 to enter Babylon Station. School Street Elimnation project on the LIRR Main Line. Work being done October 2-5.
LIRR Main Line is shut down. Shuttle service between Hicksville & Babylon are running so passengers can access Points west and points east to the Ronkonkoma and Port Jefferson branches. In this vi... (more)