End of the day for MMA 8569; 60 seconds later, the engine was shut down. Loco was used for track work at the Farnham yard.
Nice GE's switching in Farnham's yard at the end of the day (the guy in the cab was bored to death!)
Yard switcher power CP SW1200RS 8131 with CP SW1500 1298 (now departed) it between assignments in the D&H East Binghamton Yard. Tower on right is xDL&W.
A pair of switchers drift down to get another cut of cars.