Coos Bay Rail Link's train to Eugene departs little Noti, Oregon, on August 26th, 2015. The eastbound, powered by GP38s 3877 and 3876 (formerly Southern Railway 2813 and 2796) and GP38M 3802 (ex-B... (more)
An eastbound Coos Bay Railway train, having completed some switching in Noti (the last switching the train would do before arriving in Eugene) passes through Veneta, Oregon, on August 26th, 2015. ... (more)
Coos Bay Rail Link's train to Eugene arrives in little Noti, Oregon, on August 26th, 2015. The eastbound, powered by GP38s 3877 and 3876 (formerly Southern Railway 2813 and 2796) and GP38M 3802 (... (more)
As the Coos Bay Hauler slows to a halt outside of a lumber mill, the crew of CBR 3876 prepares for the add on of CBR 3823 to the point of their train. After a twenty minute stop, the train would c... (more)
A shorter than usual Coos Bay Hauler rolls down the eastern section of the branch on its way to the Oregon coast.
CBR 1203 leads the first revenue train westbound out of Tunnel 14 on the Coos Bay Rail Link main line. Other than a work train in September 2011, this is the first train over this line since Sept... (more)