Leaded by one Dash 9 and one of four Dash 8's that EFC have, that iron ore loaded train prepares to depart from siding#02. That is the last siding before the train arrives on his final point of th... (more)
View of SD70M's#715 engineer's control desk. Waiting for a meet at siding#02.
The first ES58ACi to be unloaded from the ship Industrial Egret, been placed over his truks.
Dash 9 still wearing the CVRD paint scheme at Receiving Yard and not Reception, waiting your turn to go to one of four dump cars.
Several brand new Dash 9's lined up waiting for the comissioning.
Brand new GE ES58ACi locomotive for VALE (former CVRD) been unloaded from the ship in one of the berths of São LuÃs Port. The VALE bought ten of these giants to pull the new standards of the iro... (more)
Loaded iron ore train waits for an empty iron ore train to pass by it, to be able to proceed to the final point of his trip around 20Km away to be unloaded.