Slowly battling the 1.5 percent grade of the eastern slope of the Arizona Divide, three GE locomotives pull a CSX interchanged (Chicago) to Los Angeles, CA intermodal train through Angell.
Locked in a battle with gravity, BNSF 6851 struggles up the 1.4 percent grade at Angell as the sun rises behind some cloud cover over the Arizona Divide.
As a heavy 10,000 foot stack train struggles up the Arizona Divide on main track #1, a hot Willow Springs, IL to San Bernardino, CA UPS train races up main track #2 to run round the slower train. ... (more)
The Super Moon Eclipse begins to rise over the Colorado Plateau as a heavy Los Angeles Harbor bound stack train slowly climbs the 1.5% grade at Angell.
Working hard up the 1.5 percent grade, a trio of GEVOs struggle to pull an Atlanta, GA to Los Angeles, CA intermodal train over the Arizona Divide at Angell.
With ease, BNSF 7886 hustles 5700 feet of double stacks and trailers over the Arizona Divide as it the sounds of GE engineering roar with life.
The last North Bay to Willow Spring, IL Z train of 2011 makes its way across the Arizona Divide on the first day of the new year as it charges through Angell.
First Train of the New Year! BNSF 7273 leads a hot Z7 across Angell to Winslow as the first light of the new year shines on this Texas bound train. A great way to start off the year.
Stacks battle towards the Arizona Divide, at Angell.
Climbing out of a dip approaching Angell