The 07:00 Proctor Roadswitch eases a loaded ore train down the 2.2% of Proctor Hill as the trees show a hint of fall.
Empty pellet train for loading at United Taconite arrives at the plant.
Colorful wild flowers dot the hillside as a loaded UTAC pellet train heads for Proctor (Duluth).
Loaded UTAC pellet train with 140 cars and a nice matched set of SD38s heads for Proctor (Duluth).