CPKC 31 local eastbound heading back to Wylie yard with 4 new CPKC locomotives (CP7477, CP7516, CP7515, CP7518) and 8800 feet long train from BNSF Alliance yard with 2 BNSF engines doing th... (more)
CPKC 31 local eastbound heading back to Wylie yard with 4 new CPKC locomotives (CP7477, CP7516, CP7515, CP7518) and 8800 feet long train from BNSF Alliance yard with 2 BNSF engines doing th... (more)
As of the last day of August 2025, #821 is the last "Champ" GE running the mainline, everything else is in the shop area waiting for repaint. The return of the units from Mexico should ... (more)
After loading and then shoving from Keewatin Taconite back to Kelly Lake, BNSF 3737 is ready to depart the yard and head down to BNSF's ore dock facility at Allouez, WI.