The day after the last of 3 snow storms in a row, the Albany Port RR shuffles grain cars in the Port Yard while a set of CSX road power for the Selkirk to Port of Albany local lays over.
The day after the last of 3 snow storms in a row, the Albany Port RR is spotting tank car loads at the Westway Feed Products Terminal at the Port of Albany.
One of 2 switchers used by the Albany Port RR is framed between the Weeks 533 barge crane and the ship BBC URSA. The switcher is spotting a load out of GE Energy on the dock for loading onto the W... (more)
On the first Sunday of Fall 2016 the Albany Port RR puts in a rare Sunday work day to assist in the unloading of the BBC Alberta. The ship is located out of sight to the left as the on board crane... (more)