Racing up to Minntac to load taconite pellets and passing by m.p. 1 on the namesake sub with 6 miles to go until the plant and the east loadout pocket.
The 1x1 setup on U790 has CN 3327 as the DP unit shoving 145 ore cars along the Minntac sub as they head up to the mine to load taconite pellets. A bad order setout sits on the siding after appare... (more)