#205-7M is arriving at Rio Fiorita with a train of empties. On the left is one of the two coal loading facilities of Rio Fiorita.
The loading of the coal at Rio Fiorita has been much delayed and the train could leave the facility only a few minutes before the sun disapeared behind the mountains.
The Santa Fe #205-7M has arrived at the Rio Fiorita coal loading facility with an empty train. One of the loading points can be seen in the back.
Rio Fiorita coal loading facility.
The Skoda Santa-Fe #205-7M is arriving at the Rio Fiorita coal loading facility with an empty train. A Bernd Seiler charter.