UP 5357 is just about finished dragging this very long stack train up to the summit of Peru Hill. The grade begins at the Green River Bridge at the west end of the Green River Yard and ends 8 mile... (more)
After sitting here at the CP G819 Hold Signal for some time, UP 8218 has finally received permission to go ahead into the Green River yard for a crew change.