After a back-up move to get the train's conductor, the recently loaded B880 departs Morrison. Upon arrival in Westernport, the train was tied down before a new crew took it to Mount Storm.
A dreary day in the Georges Creek Valley is brightened by a patch of vibrant foliage.
After spending over four hours loading, B880 heads south for Westernport.
This spot was the end of the line for B880, from here he shoved south as the train was loaded.