On August 19, 2017, loaded Union Pacific coal train CWTCL9-18 hustles its way east as passes through Keith on its way from West Thunder Mine in Wyoming to Coleto Creek, Texas. UP AC4400CW 5609 is... (more)
On the home stretch into North Platte's receiving yard, symbol MKSNP-15 out of Kansas City slips through the control point at Keith, NE on a late winter afternoon. The newly installed third mainli... (more)
This Proviso to North Platte manifest is about 5 miles short of arriving at destination on the Union Pacific. The C&NW GP50's were equipped with 2 cab signal systems, both UP CCS and C&NW ATC, to ... (more)
Back in the 1970s, and into the 1980s, railroads often hauled their high-priority intermodal trains, mainly piggyback and also a few containers, as fairly short trains with a generous supply of po... (more)