There's not much at EE Georgia to tip you off to the fact that it's 2020, and the once-prosperous mainline of the B&O hasn't had a through train in years. WO81, with UP power, shoves past the clas... (more)
W081 shoves eastbound past the doll arm signal at EE Georgia, after laying ballast on the Indiana Sub the previous day.
A rail train drifts into the siding at Georgia to tie down for the evening.
It about 11PM as two Union Pacific motors power this east bound freight past the B&O CPL's at Georgia.