The Northfield passes through Farmington with a recently overhauled SD40-2 in the lead. This job's purpose is to interchange with the PGR at Rosemount and Northfield.
The engineer of the northbound gives a friendly wave to the passing southbound at Farmington.
After a stop at the Kwik-Trip, the trek south continues.