Omaha Track's 1501 at Eaton, CO.
UP 8062 (ES44AC) runs south on the Greeley Sub with a freight destined for Denver, Colorado.
UP 8062 (ES44AC) leads a freight through Eaton, Colorado as it heads to Denver on the Greeley Sub.
UP 5536 (AC45CCTE) brings a freight into Eaton, Colorado on the Greeley Sub.
Omaha Track's 1501 (SW1500) waits for orders to sort sand cars at Eaton, Colorado.
UP 4014 leads a short test train at Eaton, CO, on the UP Greeley Sub, July 8, 2021.
Test Run 2021 Ed Dickens and crew roll into the warm light of a hot July evening south of Cheyenne on their way to Denver performing a test run.
Among the Black Eyed Susan Patch Sharing some time with a bumble bee and a wasp I wait in the humid hot evening air north of Greeley along the route of the legends. Che... (more)
a UP southbound freight led by 5536 (AC45CCTE) passes through Eaton, Colorado on its way to Denver.
UP 8762 (SD70ACe) gets ready to lash up to a string of sand cars which it will take from Eaton, Colorado to LaSalle.
This good looking switcher can be found working the fracking sand facility in Eaton, Colorado.
UP 8762 SD70ACe leads UP 2001 and a freight through Eaton, Colorado while working the local out of LaSalle.
UP 1667 & 1817 (both EMD SD40N) wait in a siding at Eaton (CO) for departure.
The Frontier Days northbound train has just made its stop in Greeley and is already back up to track speed as the pass through the local farm lands.
Union Pacific 4-8-4 No. 844 and ES44AH No. 2760 lead a "Break In Special" south through the small town of Eaton, Colorado on April 10, 2017. The train was symboled PCYCY3 10, and it operated along... (more)