Engineer throttles up the SD70M (Dash 9 was trailing) after a meet with a loaded iron ore train at Siding #03. So nice to hear the sound of the 16-710G3C-T1.
Highest numbered SD70M leading empty ore train departing right after a meet from Campo de Perizes bound to the Carajás Mining Complex. My first railfaning of the year ;-)!
Empty grain train waiting for a meeting with a loaded iron ore train. The train was very light (around 2240 tons) for 10400 HP's so, only the Dash 9 was pulling, the SD40-2's were trailing.