A pair of former Oakway SD60s lead L506 over the 2,682 foot long Arcola High Bridge. Movements over this bridge in favorable light take place just a few times per year at most.
3 SD60s lead L506 over the 110 year old Arcola High Bridge. This is an extremely difficult shot to get, as this structure only hosts 2 trains a day that almost always run at night or out of the su... (more)
CN 5437 and 5462 head east over the Arcola bridge.
The Arcola High Bridge sees two trains a day and is rarely photographed due to the times trains roll through. Today the westbound was running late giving time for the sun to swing around enough t... (more)