Do they not want two trains on the bridge at once, and are the lines set up for bi-directional running? Just curious. Thanks.
|
Posted by xBNSFer on April 22, 2022 | |
If memory serves me correctly, the second track is not in service on the bridge; it's still single track here.
|
|