| Posted by Loko on March 20, 2021  |  |   
It seems that not all tracks have been cleared of snow, especially those leading to the second tunnel entrance. Is it a cost-cutting measure because the passing sidings are hardly used for freight traffic any more?
  | 
 
The tracks leading to the left tunnel entrance are all out of order, for the construction of a loading facility for the excavation of the new second Gotthard road tunnel. There are tracks 1 to 3 usuable only now.
  | 
 
  |