Posted by Michael Derrick on May 9, 2020 
Nice shot, Blane. Did they have another locomotive on the end of the train? Supposedly they can't runaround the train at Barnett and used to shove all the way back to Washington. GP20 5625 was sent there so they would have two units and run the train double ended. As you say, this is a very rarely seen operation, so I'm interested to hear if that double-ended power really is happening.
Posted by Blane Brandenburg on May 15, 2020 
Michael Derrick they did not have another engine on the rear. The other engine was not active while I was there. They had ran engine light down to the interchange and back to Washington with cars. Apparently they do not run cars to CSX that often.
- Post a Comment -