Posted by Greg Custer on February 17, 2020 
Georg, why are all of the freight trains going over the Lotschberg line instead of through the tunnel?
Posted by Georg TrĂ¼b on February 18, 2020 
@ Greg: There was a water inrush in one of the bores of the Base tunnel on the 6th february, and this bore was and is till about 21th february closed for traffic. So there is a lack of capacity and many freights, all in direction south-north, are running via the mountain line.