These signals are not being replaced by "PTC". NS is carrying out a general re-signaling project, motivated in party by the need to install a PTC capability, but also motivated by the signal's age and desire to increase capacity with waysideless bi-directional operation on all 3 tracks.
|
Correct. Not replaced by PTC, But for PTC.
|
|